Sign In | Join Free | My infospaceinc.com
China Zhenjiang Shangrong Electromechanical Equipment Co., Ltd logo
Zhenjiang Shangrong Electromechanical Equipment Co., Ltd
Verified Supplier

1 Years

Home > Compact 200 bailey bridge >

multispan steel bridge in China

Zhenjiang Shangrong Electromechanical Equipment Co., Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

multispan steel bridge in China

Payment Terms : L/C,T/T

Delivery Time : 15 working days after prepayment

MOQ : 1 Set/Sets

Price : US $ 1,000 - 1,500 / Ton

Supply Ability : 2600 Ton/Tons per Month

Packaging Details : by container

Place of Origin : Jiangsu, China (Mainland)

Brand Name : zhongye

LOAD CAPACITY : 55t

Certification : IOS9001

Model Number : Q345B

ONE SPAN OF 2 SPANS : 33

Contact Now

Specifications

1 Less expense, wide usage
2 for other supporting use
3 Send engineers to guide labor
4 Factory direct export

Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.

Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.

The compact 200 panel bridge: The compact 200 panel bridge is similar to the compact 100 panel bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes. Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.

The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc.

Span Construction-Load Table --- Extra Single Lane (W=4200mm) Span Construction-Load Table ---Double Lane (W=7350mm)
SPAN-ft HS-15 HS-20 HS-25 SPAN-ft HS-15 HS-20 HS-25
30 SS SS SS 30 SS SS SS
40 SS SS SS 40 SS SS SS
50 SS SS SS 50 SS SS SSR
60 SS SS SS 60 SS SSR SSR
70 SS SS SSR 70 SSR SSR DS
80 SS SSR SSR 80 SSR DS DSR1
90 SSR SSR SSR 90 SSRH DSR1 DSR2H
100 SSR SSR SSR 100 DSR1 DSR2H TSR2
110 SSR SSR DS 110 DSR1 DSR2 QS
120 SSR DS DSR1 120 TS DSR2H TSR2
130 DS DSR1 DSR2H 130 DSR2H TSR2 TSR3
140 DSR1 DSR2H DSR3H 140 TSR2 TSR3 TSR3H
150 TSTSR2 DSR2H DSR4H 150 TSR3H TSR3H QSR4
160 DSR2H DSR2H TSR2 160 QSR4 QSR4 QSR4
170 TSR2 TSR2 TSR3 170 QSR4 QSR4
180 TSR2 TSR3 TSR3H 180 QSR4
190 TSR3H TSR3 QSR4
200 QSR4 TSR3QSR3 QSR4

Remark:

1.SS shows one range one tier; DS shows two ranges one tier; TS shows three ranges one tier; DD shows two range two tiers etc.

2.If R follows SS, DS, DD, etc, means reinforce type,and R1 means only one range reinforced, R2 means two ranges reinforced


Quality multispan steel bridge in China for sale

multispan steel bridge in China Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Zhenjiang Shangrong Electromechanical Equipment Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)